Full Penetration Welding
Laser-welding for pipeline constructions (BAM VH 5484)
Work carried out within this project had the aim to detect signals during pipeline welding correlating with the welding result in such a way that a conclusion can be drawn whether the material was fully penetrated or not. Therefore, several measuring concepts were developed and transferred into a laboratory setup which was able to work on-line and detect signals from the outside of the pipe.

Funded by
BMWi
Timeframe
2008/08/01 – 2009/07/31
Department Manager
| Phone: | +49(0)421 - 218 58000 | (Switchboard) |
| +49(0)421 - 218 58040 | (Direct Line) |