You are here: Home Projects Full Penetration Welding
Personal tools
Document Actions

Full Penetration Welding

Laser-welding for pipeline constructions (BAM VH 5484)

Work carried out within this project had the aim to detect signals during pipeline welding correlating with the welding result in such a way that a conclusion can be drawn whether the material was fully penetrated or not. Therefore, several measuring concepts were developed and transferred into a laboratory setup which was able to work on-line and detect signals from the outside of the pipe.

Full Penetration Welding



Funded by

BMWi

Timeframe

2008/08/01 – 2009/07/31

Department Manager

Dr.-Ing. Thomas Seefeld

Phone: +49(0)421 - 218 58000 (Switchboard)

+49(0)421 - 218 58040 (Direct Line)